Please let us know if you are having a problem with this application. Or, if there is something you would like us to add or change feel free to suggest it here.
The gear is being built. This can take anywhere from 10 seconds to a few minutes.
The next loading graphic may stop or skip, but that is just because the viewer is loading.
Click the arrows to draw a keyway at that location. All of the keyways will be positioned based on the default. <more>
Click the setscrew to highlight it at that location. All of the setscrews will be positioned based on the default. <more>
D Bores
2D not available
for custom parts.
Type of Load: | |
Duration: | |
Normal/Transverse | |
RPM: | |
Load in lbs @ pitch line: | |
Safe static stress: | |
Velocity (feet per minute): | |
Horsepower: | |
Torque (inch lbs): | |
Strength Factor: | |
Service Factor: | |
Information in this chart is to be used as a guide. Consult an engineer for more information. Backlash is ignored in this calculator. |
Parts for quotation
Rush Gears holiday schedule:
Fri December 20th: | open 8am - 2pm |
Mon December 23rd: | closed |
Tue December 24th: | closed |
Wed December 25th: | closed |
Thu December 26th: | open 8am - 2pm |
Fri December 27th: | open 8am - 2pm |
Mon December 30th: | closed |
Tue December 31st: | closed |
Wed January 1st: | closed |
Thu January 2nd: | open |
Fri January 3rd: | open |